What happens if the ASRS goes down?

25.09.2026

When an automated storage and retrieval system (ASRS) goes down, the impact depends on which component has failed and what contingency measures were engineered into the system from the start. A network controller outage affects the entire facility differently than a single stacker crane fault. Contingency planning is not an afterthought; it belongs in the design phase of every automated high-bay warehouse project.

The severity of an interruption, the speed of recovery, and the continuity of operations all trace back to decisions made during system engineering. Below, we examine how different failure types affect ASRS operations, what an automated warehouse contingency plan should cover, and how Pesmel approaches these challenges during project design.

How Do Different Interruptions Affect ASRS Operations?

Different ASRS interruptions produce different operational consequences because automated high-bay storage systems consist of multiple interdependent layers: mechanical equipment, control software, power supply, and communication networks. A fault in one layer may leave other layers fully functional, while a shared infrastructure failure can halt the entire facility.

Local Equipment Faults

A single stacker crane malfunction or conveyor segment stoppage is a localized event. It typically affects one aisle or one zone of the high-bay storage area while other aisles and handling routes continue operating. Throughput drops proportionally, but the Warehouse Management System (WMS) can often reassign tasks to functioning equipment if the system architecture permits it. Maintenance teams can diagnose and address these faults while the rest of the facility remains productive.

Shared Infrastructure Failures

Power outages, network communication breakdowns, or central control system failures are a different category entirely. These affect every piece of equipment simultaneously. Without power, stacker cranes stop mid-cycle. Without network connectivity, the WMS cannot issue commands or track inventory positions. Without the control system, even powered equipment has no instructions to follow. These shared failures demand fundamentally different contingency responses than local equipment faults, including standby power systems, redundant network paths, and data backup strategies that preserve inventory state information.

Understanding this distinction is essential. An organization that prepares only for crane faults will be unprepared for a facility-wide network outage, and vice versa.

What Should an Automated Warehouse Contingency Plan Cover?

An automated warehouse contingency plan should cover every plausible failure scenario, define minimum acceptable service levels, identify available alternatives, assign clear recovery responsibilities, and establish tested restoration procedures. Without these five elements, a facility is reacting to emergencies rather than managing them.

A thorough contingency plan treats ASRS downtime as an engineering problem to be solved in advance, not a crisis to be improvised through. The following checklist outlines the core planning requirements:

  1. Failure scenario identification: Map every component and subsystem that could fail, distinguishing local equipment faults from shared infrastructure failures such as power, network, or control system outages.
  2. Minimum required service definition: Determine the lowest acceptable throughput and which operations (inbound, outbound, or both) must continue during degraded conditions to keep production lines running.
  3. Available alternatives: Identify what physical rerouting options, backup power sources, redundant communication paths, or data recovery mechanisms exist within the current system design.
  4. Recovery responsibilities: Assign specific roles and escalation paths so that maintenance personnel, system integrators, and operations managers each know their tasks during an interruption.
  5. Tested restoration procedures: Document and periodically rehearse the steps required to bring each subsystem back online, including data integrity verification and inventory reconciliation after a control system restart.

These are planning requirements, not features that come automatically with any ASRS purchase. Each facility’s contingency plan will differ based on its layout, throughput demands, product characteristics, and risk tolerance. A paper mill handling heavy rolls has different continuity priorities than a tire warehouse sorting thousands of SKUs. The plan must reflect the specific operational context.

Data backups protect against loss of inventory position records. Standby power systems address electrical supply interruptions. Physical alternative routes within the material flow layout address mechanical blockages. Each countermeasure solves a different problem, and no single measure covers all failure types.

How Does Pesmel Engineer Contingency Into Warehouse Design?

Pesmel addresses ASRS redundancy and failure recovery during the engineering phase, not as a retrofit. This engineering process considers exceptional situations as part of system design, ensuring that rerouting capability is built into the physical layout where the project scope requires it.

This does not mean every warehouse receives identical redundancy. Pesmel works in close cooperation with each customer to assess which failure scenarios pose the greatest operational risk and which contingency measures deliver the most value relative to the investment. The result is a system where continuity decisions are informed by simulation, operational data, and decades of experience across more than 600 deliveries.

Want to understand how contingency planning applies to your specific facility and production requirements? Contact Pesmel’s team to discuss a project-specific continuity assessment.

Pesmel Oy
P.O. Box 14 (Päntäneentie 3)
61801 Kauhajoki
Tel. +358 20 7009 600
Email: pesmel(at)pesmel.com

FAQ »

Privacy policy »
Pesmel General Purchasing Conditions of Goods and Services (21.3.2021) »
Pesmel Yleiset ehdot tavaroiden ja palveuiden ostamiselle (16.03.2021) »
Pesmel General terms and conditions for deliverables and services (26.05.2026) »
Pesmel General terms and conditions for spare parts and maintenance (Rev07 26.01.2022) »

Follow us

LinkedIn

© Pesmel Oy - 2026
Cookie SettingsReject AllAccept All
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent. For further information, please read the Pesmel Cookie Policy
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
_GRECAPTCHA6 monthsUsed to utilise reCaptcha spam filtering for the forms.
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
CookieDurationDescription
_ga2 yearsGoogle Analytics tracking cookie
_ga_********2 yearsGoogle Analytics tracking cookie
_gat_gtag_UA_167127014_11 hourGoogle Analytics tracking cookie
_gid24 hoursGoogle Analytics tracking cookie
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
SAVE & ACCEPT